Structural design
Constructions developed around the product, the packing process and the pallet, not adapted from the nearest stock size.
Bespoke developmentStructural design in CAD, physical samples and line trials before anything goes into production. The stage that decides whether packaging performs, and the one most often skipped.
Each part solves a different problem. Most programmes use several of them together.
Constructions developed around the product, the packing process and the pallet, not adapted from the nearest stock size.
Bespoke developmentCutting dies specified and stored against each size, checked against the print method and board before artwork is committed.
Printing3D models and technical drawings, so everyone is approving the same thing before tooling is cut.
Request a designSamples produced for fit, strength and handling, and for sign-off by the people who will actually pack the product.
Box FinderPackaging run on your line before it goes live, because a pack that erects slowly costs more than the board it saves.
Food & drinkCompression, drop and transit testing where the journey or the product value justifies the evidence.
Board gradesMost ranges contain sizes nobody has questioned for years, carried forward because they were always bought.
Board grades drift upwards after a damage incident and rarely come back down, which quietly adds cost to every box.
A box that does not fit the product pays for air in freight and in void fill, on every single shipment.
Packaging approved on a desk sometimes fails on a line running at speed, where seconds per pack decide labour cost.
A change made to save money on board often costs more in damage than it saved, unless it is trialled first.
When specifications live in people's heads and old emails, the same box ends up different at every site.
It depends on the scope. For a programme of work it is normally part of the engagement. One-off bespoke projects are quoted up front so there are no surprises.
It varies with the construction and whether tooling is needed. We give you a timeline once we know what is being made, rather than quoting a number that might not hold.
Yes. Compression, drop and transit testing can be arranged where the journey or product value justifies it, and line trials are strongly advised before any change goes live.
The product, how it is packed, how it is distributed and what is going wrong today. Current specifications and a sample of the existing pack help, but we can work from what you have.
That is agreed at the start, and it is worth settling before any die is cut rather than after.
Send us the product and the pack you use today. We will design, sample and trial an alternative before anything changes on your line.